Asbestos Abatement Before Demolition in Dallas

Typical cost in Dallas

  • Survey of a whole house before a teardown$650 – $1,500+
  • Whole house before a teardown, several materials$10,000 – $28,000+

When a Dallas building is coming down, the asbestos question has to be answered before the crew and the permit. We arrange the survey, remove what it finds and keep the records, so the teardown starts on a clear footing.

Houses, small commercial buildings and apartment buildings in Dallas, Highland Park and Mesquite all qualify. Rules differ by building type, so we begin with what you are taking down.

Request a free quote
A section of wall around an old electrical panel cut out neatly, with plastic taped around the opening

Demolition jobs

House teardowns

Demolishing one house by itself triggers no DSHS notice. A survey still shows you what is in the house before work begins, and the permit office may want to see it, so ask the city before you apply.

Commercial and apartment buildings

Here the survey comes first, and DSHS must hear about the demolition of a commercial building at least 10 working days ahead, with or without asbestos. A building of more than four apartments counts as a facility under the state rules.

Gut jobs and partial demolition

Dallas's demolition checklist asks for a survey of the area being renovated and/or demolished, so a job that strips part of a building is covered by the same item as a full teardown.

The Dallas demolition permit

Planning and Development's demolition permit checklist (form 26-001, dated February 3, 2026) has an item for an asbestos survey of the area being renovated and/or demolished. The application also asks where the debris will go and what route the trucks will take.

Another item asks for liability insurance that covers asbestos hazards when the project includes asbestos, with a note that insurance is not required to demolish a one- or two-family dwelling. The office is at 320 E Jefferson Blvd, (214) 948-4480.

Where the waste goes

Asbestos waste needs a landfill that is permitted to take it, and even then a landfill may turn a load away. That is why the disposal site is arranged before work begins.

Frequently asked questions

Does Dallas require an asbestos survey for a demolition permit?

The demolition permit checklist includes a survey of the area being renovated and/or demolished. Planning and Development, at (214) 948-4480, can explain how that applies to your building.

Who files the DSHS notice for a demolition?

The owner is responsible. For a public building the owner may name an agent, such as a DSHS-licensed contractor or consultant, in writing, but responsibility stays shared, and the notice is due 10 or more working days before demolition.

What does abatement before demolition cost?

Whatever the survey finds sets the price. A small amount of floor tile in one house and ceiling material through a whole building are very different jobs.

Asbestos testing and surveys explains the sampling behind every teardown. For other jobs, begin at the Dallas Asbestos Removal homepage.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (972) 534-2176

Call (972) 534-2176